The Future of MEP: Modularized & Lean
Today, an increasing number of buildings are being constructed in much the same way as nuclear aircraft carriers. Modularization and lean construction employed in the production of large, complex ships are being applied to building construction, especially for MEP (mechanical, electrical and plumbing). The following looks at these processes and how they reduce schedules, save money and increase quality in the building industry.
Design & Breakdown
The current capabilities of computers, software and other digital technologies have driven a revolution in MEP modularization. Just as specialized software makes the design and construction of one-of-a-kind ships easier and faster, the Building Information Modeling or BIM process and software enable the complete three-dimensional design of a complete building with information and data about all materials, hardware and systems. BIM automates the design and collaboration process, minimizes rework and aids in development of virtual construction workflow. It also automatically detects interference or clashes of materials and delivers dimensional details, drawings and material take-offs (MTOs) usable for building.
When the design of an aircraft carrier is complete, it is then broken down into nearly 200 modules or so-called “superlifts”. Each superlift contains multiple areas or compartments on different decks and weighs between 80 and 900 tons. Similarly, BIM is used to break down a building into elements that can be modularized such as cable trays, water, gas and process piping, ductwork and the racks to hold them. Complete bathrooms, mechanical and electrical rooms and various mechanical equipment can also be modularized.
Advantages of Modularization
Lower cost, shortened construction schedules and higher quality are the principal advantages of using MEP modularization for building construction. These are the same reasons for constructing superlifts in a fully outfitted fab shop and assembling them rather than “stick-building” an aircraft carrier from the ground up. Other advantages of MEP modularization compared to stick-building, include:
Lower Cost
The current capabilities of computers, software and other digital technologies have driven a revolution in MEP modularization. Just as specialized software makes the design and construction of one-of-a-kind ships easier and faster, the Building Information Modeling or BIM process and software enable the complete three-dimensional design of a complete building with information and data about all materials, hardware and systems. BIM automates the design and collaboration process, minimizes rework and aids in development of virtual construction workflow. It also automatically detects interference or clashes of materials and delivers dimensional details, drawings and material take-offs (MTOs) usable for building.
When the design of an aircraft carrier is complete, it is then broken down into nearly 200 modules or so-called “superlifts”. Each superlift contains multiple areas or compartments on different decks and weighs between 80 and 900 tons. Similarly, BIM is used to break down a building into elements that can be modularized such as cable trays, water, gas and process piping, ductwork and the racks to hold them. Complete bathrooms, mechanical and electrical rooms and various mechanical equipment can also be modularized.
Advantages of Modularization
Lower cost, shortened construction schedules and higher quality are the principal advantages of using MEP modularization for building construction. These are the same reasons for constructing superlifts in a fully outfitted fab shop and assembling them rather than “stick-building” an aircraft carrier from the ground up. Other advantages of MEP modularization compared to stick-building, include:
Lower Cost
- Productivity in a fab shop is significantly higher
- Modules usually require up to 30% less material
- Ease of module installation requires less time and fewer workers
- Inventory and storage of material in fab shop reduces waste and loss
- Building duplicate modules further reduces costs
- MEP modules are fabricated in parallel with building erection
- Module installation takes much less time
- Coordinated module delivery minimizes site interference and wasted time
- Shop testing of modules reduces need for site testing & startup time
- Shop-built modules are less likely to have defects in workmanship
- Shop work promotes higher accuracy and consistency
- Quality control is easier and more effective
- Pipefitting, welding and fabrication are done under optimum conditions
- Finished modules are stored in clean conditions off-site until needed